I finally got my ass in gear this afternoon. Installed a new shower valve. Then set the metal pan. I leveled the pan on a 1.5" bed of mortar after stapling down some tar paper and metal mesh to the sub floor. It won't be going anywhere or squeaking once it sets up.

Gonna at least pick up the wallboard today. Then get it closed back up.Name:  20210716_165925 (1).jpg
Views: 322
Size:  411.0 KB